Archives

Home/Archive for "News 2017"

INVECO HOLDING SpA, Working Progress in Ciriè (TO), client : COOPER STANDARD ITALY SpA Realization of the new executive offices, installation of the new thermal power room consisting of two new steam generators of 2.8 MW (CANNON), thermal output of 2,400,000 Kcal/h,  new exterior post-demolition areas. Work progresses according to programs shared with the client. […]

Read more

MELLO AZEVEDO S.A -Industrial Plant -CCR METRO BAHIA: Work in Progress 02 Octber, 2017 Work in progress of the new Metro and Bus terminal of the Salvador and Lauro de Freitas Metro System, in Bahia  

Read more

ISO 9001 CERTIFICATION 27 September, 2017 The 26th and 27th of september in Ciriè (TO) we have had the monitoring audit of ISO 9001 Certification. This audit have included both documental procedure and all operative phases of the building site, directly managed by INVECO staff. The monitoring audit was carried out by SGS Lead Auditor, Eng. […]

Read more

INVECO HOLDING SpA: Maintenance of the industrial floor SumiRiko Italy SpA – Scarlino (GR) plant 05 September, 2017 At the end of August, in collaboration with its supplier Tecopolimeri Srl, Inveco finished the maintenance of the industrial floor with epoxy resin reinforced with carbon fiber.  Industrial floor surface is 1.000 sqmt. The maintenance process stage: […]

Read more

Demolition of the old thermal power center , Cooper Standard Italy SpA Ciriè (TO) plant 28 August, 2017 Demolition of the old thermal power center , Cooper Standard Italy SpA Ciriè (TO) plant. During the last August Inveco demolished about  9.600 sqm. The waste material was recycled and brought to a deployed landfill.

Read more