Modulo Tools: installation work on the 133.92 kW photovoltaic system is almost complete
The installation works of the photovoltaic system are about to be completed: Modulo Tools, the engineering company in the automotive sector in Umbertide (Perugia), founded in 1995.
As mentioned in the previous news, linked to this project, for Modulo Tools we have already worked with a photovoltaic system 3 years ago (this is the link to read the complete news and find out all the details).
To date, the installation of the 133.92 kW photovoltaic system is almost complete.
We installed 237 Jinko Solar 565 Watt modules on the industrial roof, supported by an aluminum structure produced by www.teknomega.it, and 2 Huawei-type inverters of 50 KTL.
The plant will go into operation in the next few days, giving the customer an energy autonomy of the plant close to 50%.
We also want to clarify that the plant was partly financed through the funds of the Solar Attack tender, the project in fact placed first in the ranking for the allocation of funds.
Furthermore, it is with great satisfaction that we see how our commitment to the renewable energy sector continues to be rewarded by our customers.
The trust they place in us in granting us new projects is a clear signal that we are achieving the desired results.
We feel honored and gratified to be able to contribute to the advancement of sustainable energy solutions. Our philosophy, which focuses on renewable energy as a protagonist and ally for our future, is shared and embraced by our customers.
This synergy further motivates us to continue giving life to projects that respect the environment and promote a better future for the next generations.
If you are interested in a similar project you can write to us by sending an email with your specific needs and references.
Il nostro team tecnico è operativo nel territorio nazionale h 24.